Preparation & Priming
The first step in any masonry renovation is thorough preparation. To ensure a clean and sturdy foundation, Ray Horton Painting and Decorating began by washing the exterior surfaces with an anti-fungal agent. This essential step not only removed unsightly marks but also helped to protect against future growth, ensuring a long-lasting finish.
Once the surface was clean and ready, the team turned their attention to addressing any imperfections.
Loose debris was removed, and cracks were raked out to create a stable base. Next, a high-quality masonry repair filler was applied to fill these gaps and ensure a seamless look. This preparatory work was crucial to achieving a flawless final result.